Current Location: Up the River Aulne, SE of Brest.
Well, it’s grey and miserable but we are in a beautiful location up a river in Brittany very similar to the river Fal where we left from last Wednesday. An ideal time to catch up with the blog even though there is no internet coverage here.
The big news is that we've made it to France. On returning to Mylor we found the marina had moved Mehalah inside the wave breaker pontoon as strong easterly winds were predicted. Now that’s good service. We also found that the unhappy dinghy engine carburettor needed to be replaced as the tiny galleries could not be cleaned using the marina’s ultrasonic vibrator. This gave me some comfort in as much as there was no way I could have fixed it but concern that it might happen again somewhere more remote. At least we will have a clean system to get started with. This and completing the Aries wind steering installation were the two main tasks left before we could depart.
The Aries work consisted of bolting on the new stainless framework and running lines from the unit to a small drum bolted to the steering wheel. Sounds simple? In theory it is, the whole process is supposed to take around 6 hours. In practice though not so easy. Over several days the unit was hung in position by way of the topping lift, marks made for where the holes should be in the transom and the holes drilled. Each bracket, of which there were four,required someone (John) holding a spanner on the outside whilst someone else, ideally a multi-limbed, double-jointed dwarf (Gill) tightened them from inside the extremely cramped lazarette (cupboard). Bad language was heard when I realised that one bracket that had taken 45 minutes to install was upside down and had to be unscrewed and reinstalled, but eventually this part of the operation was complete.
Next day the new carburettor had still not arrived.
You may remember the forward hatch leaks? Well, rather than take out the seal and replace (big job) or remove the entire hatch, replace and rebed (even bigger job) we bought some “Capt. Tolley’s Creeping Crack Remedy”! And it worked. Gilly squirted it into the leaky area, it ran into all the gaps, she waited for it to dry, did it again, and repeated. Eventually no more came dripping into the cabin and the job was done. Great job Gilly. Something that was actually easier than expected!
 |
| The magic Capt Tolley's Creeping Crack Remedy. |
Whilst in the lazarette Gilly had checked the last stretch of steering chain for ‘fishhooks’ where one or more strands has snapped. You know what’s coming next. Yes, quite a few fishhooks in this inaccessible area and after some discussion we decided it really need fixing before we left.
The weather at this stage was appalling. Rain all day as a big depression swept along the English Channel. Even in this sheltered marina we saw 38 knots of wind from the side with waves breaking over the pontoon (good job we were on the sheltered side of the pontoon now). We added an extra warp for protection.
Next day the new carburettor had still not arrived and the weekend is approaching. We’re hoping to leave on Monday so time is getting tight. You can order these things on the internet and get it within a couple of days. I really don’t know why it’s taken them so long to source this thing.
Anyway Gilly was all for getting someone to replace the steering wires for us but a quick internet search showed again that the theory was simple so I voted we do it ourselves.
Usually you can disconnect the two wires that turn a quadrant bolted to the rudder stock and pull them through. Our wires of course had non removable fittings which would not go through the various pulleys and neither would the new ones go through either. So this meant removing the four pulleys, all again in the lazarette, with me now playing the (somewhat larger) dwarf role. Great, after two hours they’re off. Let’s get new ones made. Oh no, there’s an eight week wait for rigger’s time. However Gilly caught one of the riggers on his own, fluttered her eyelashes and got him to make them up that very afternoon! Which he did. And they fitted. Thanks so much Dan. How pleased he was too when she went to thank him personally for fitting our job in.
 |
| Disconnecting the forward (easy) end of the steering wires. |
 |
| I think that needs replacing! |
 |
| Re-installing the sheaves at the aft (difficult) end of the wires. |
And then the carburettor arrived. Just in time for them to reassemble it and deliver it late on Friday evening. At the same time I needed to fix the auxiliary drum to the wheel. Required? Three non standard U-bolts in stainless steel. The fabricator is busy but can, and does, squeeze us in. But he knows we really needs these so he stings us a horrendous £108 for these tiny fittings. Ouch, ouch.
 |
| The steering drum waiting for its expensive U-bolts. |
Hugh and Linda arrived next day. Linda will crew with us hopefully to Spain but the forecast shows another horrid depression coming through so we won’t be leaving for Spain, or even France for another few days yet. But not just Hugh and Linda. Linda took part in the last Clipper Round the World Race and she bought three other lady sailors she had met, Chrissie, Toni and Maria plus Chrissie’s sister Suzy. We all retired to the saloon for a VERY sailory conversation. Fascinating. Interestingly we thought they were very brave for racing hard at an angle of 45 degrees and they thought us intrepid for sailing double handed to who knows where. We had a great afternoon with them, swapping email addresses at the end when they had to return to Newquay. We ate at the excellent Pandora restaurant that evening.
 |
| Clipper Team 1 |
 |
| Clipper Team 2 |
 |
| Well wrapped up outside the Pandora pub, River fal. |
Whilst we waited for this work I start to drill the holes in the new framework that will bolt the unit all together. This proved to be the most difficult stage as the holes in the tubes needed to line up with the holes in the receiving sockets. Not surprisingly they didn’t and round section 4mm thick stainless is not the easiest thing to drill through even with Linda sitting on the other end to prevent rotation.
 |
| Awkward work at the back of the boat. |
Next day after Hugh left for home it was back to hole drilling, Linda in the dinghy, me balanced on the transom steps. Finally it was finished. Just the lines to lead back. About this time Dick and Mary arrived having driven down from Plymouth in the hope of catching us. More chat and more to eat. Don’t rush. Wait for a decent weather window. Don’t go round the outside of Biscay but straight across.
 |
| Finished. At last. |
And so the dinghy engine was mounted and off I went to test it. Cough, cough, splutter, stop. Row back to the boat, somewhat depressed. Realise that I had forgotten to switch the fuel on [yes, I know!]. Try again. All seems good. Another job off the list.
There followed yet another day of rain and strong winds as a further depression crossed the UK. Will they EVER stop? It’s supposed to be flaming June now. Luckily the blocks for the lines that had to be installed were inside the ‘tent’ that covers the cockpit so I lazily completed this job whilst Gill and Linda stowed and labelled things and generally prepared for the crossing. Gill spent time concockting her fourth(!) passage plan. We had spotted a potential 24 hour window that should allow us to get to Camaret in France. That evening we walked to Mylor Bridge and bought a few bits and bobs ready to leave the following morning (Wed 12th).
Right on cue the wind dropped and the rain sort of stopped. We did the last bit of washing and then we were off. At last we are leaving the UK. We slipped our lines, found the exit fairway and motored out past Falmouth. What’s this? Practically no wind. Just 4-5 knots and we need to average 5.5 knots so we started motor sailing. And motor sailing. And motor sailing. It got dark, sort of, and we crossed four traffic zones. Big ships which we had to avoid, all without major incident. We stood short watches with Linda overlapping ours. I panicked when I thought I was late for my next watch but it turned out my phone had put itself on an hour to French time whilst I slept. Ha ha! The only issues were a trickle of water from somewhere near the back of the boat and an occasional banging noise from the steering.
 |
| A nondescript day as we finally depart the UK. |
 |
| The first sunset crossing La Manche. |
The big event of this journey was the Chanel du Four, the first of two narrow passages where tides run strongly. The pilot book told us we were spot on time for an easy run through but our chart said otherwise. So as the sun came up we ran down the Chanel, all of us spotting the buoys as we passed and Linda ticking them off. Before we knew it we were through and time pressures were gone. We put up the sails again and ‘Paul’ our new Aries wind steering took us to Camaret. He needs tweaking but the omens so far are good. We’d arrived. Tired after little sleep but able to pick up a visitor’s mooring and relax. However after a few hours’ sleep we reviewed the weather for Biscay. Yet more depressions rolling in for days so Linda decided it made sense to return to the UK for a few days at least. Se we’re in Camaret and she needs to be in Brest TOMORROW morning to catch her 9 euro Ryanair flight!! We try buses, uber, ferries whatever. It’s only 9 miles across the water so in the end after much deliberation we decide to motor even closer so we can deliver her to the marina in Brest the following morning. With luck we can drop her off under the pretence of refuelling. But that involves negotiating the Raz de Brest, another nasty little few miles. We hit it, tired and a bit unplanned as the tide was going out against us at 3 knots and the wind was behind us. Quite exhilarating but we were tired. Not made easier as a French warship (loads of them around here in Brest) decided to set off and turn right in front of us as we slalomed our way up the Raz. Now where? Gilly had spotted what looked to be a sheltered bay but when we got there it was horrid. Blowing 18 knots right into the bay and very shallow. Discretion being the better part of valour we skedaddled across to the other side of this little inland sea (supposedly tranquil) and anchored for the night.
 |
| A tired, but satisfied skipper. |
Up at 5.30 (or 4.30 English time) we motored [again] across to Brest marina. Tied up OK using the new centre cleat spring approach and said goodbye to Linda who successfully caught her bargain flight to Southend. Full of diesel we sprung off and left again to find naval ships and ferries all over the place. Soon we were able to set our sails for a beautiful downwind run to the River Aulne where we are now. The winds were still strong but eventually we found a place to anchor. But not before we had passed a naval graveyard and, lo and behold, Jojo’s boat (Island Swift) which we had no idea was up this river.
 |
| This one's a wreck.... (rusting French warship) |
 |
| ....but this one's not (a surprise encounter with Jojo and Simon's Wylo, Island Swift). |
That’s where we are now. After a long sleep and removing our tripping line that threatened to catch in the prop as the tide turned us we took stock. This morning we discovered that the water that gathered in the bilge was from a short split in the exhaust antisyphon gooseneck and the banging was from a loose board. Both are currently under consideration.
 |
| View from our anchorage up the Rinver Aulne. |
Postscript
It's now a couple of days later and we are tied up in Brest marina. The washing is done, a few more boatie jobs have been completed and tomorrow we go to the other side of town to collect and then fit a new waterlock for the main engine. It was this that was leaking the water on our Channel crossing. It's still cold but we've done a bit of exploring, eaten some galettes and a delicious crab bisque from the fish dock. Don't say it too loudly but the forecast for the next few days is looking a bit more promising. It will be a shame if we have to leave before Linda is due to return on Friday but we've agreed if a window opens then we'll take it. We need three days of favourable wind for that to occur. Probably by tomorrow it will be looking iffy again! The question is will we get to Spain in time to meet up with Jenny and Emma? That is the question.
 |
| Sightseeing in Brest. |
 |
| Mehalah, tied up in Brest marina awaiting fair weather to sail to Spain. |
For earlier posts, see www.yachtmehalah.blogspot.com
Ah yes, we fixed the shaft brake too we think. Hopefully we now have a string of a suitable strength.
 |
| The test lab. What snaps what? |
 |
| The final solution, crabbing line!! |